top of page
Bring GPU capacity online in months, not years. Nova brings GPU capacity online at a live off-grid site. Hardware can be customer-supplied or Nova-operated, and Nova runs the site power, cooling, networking, and remote operations that turn equipment into schedulable compute. Estimated live total Off-grid energy delivered to compute Since 2022 347.9 MWh CO2e avoided 234 metric tons EPA grid basis Tree equivalent 3,897 trees EPA 10-year basis One operating site carries the public total. The West Texas footprint behind the counter is the same place that has run GPU workloads and Rune Energy testing. Live prototype site The West Texas site exists, operates, and anchors the public live total. External GPU workloads External GPU workloads have already run through the off-grid system. Field operating history since 2022 The same footprint also supported 11 months of Rune Energy testing. Site power becomes capacity when the whole site can operate. Nova schedules compute after power, cooling, networking, controls, service access, and remote operations clear as one site system. 01 Bring site power online Solar, storage, switchgear, controls, and compatible GPU load path clear together. 02 Bring cooling and remote ops online Cooling, network handoff, service access, and remote operations clear before timing is promised. 03 Bring the pod live The workload gets a start window only when the site system can be operated. How it works
Have a workload and a timeline? Tell us the workload, hardware plan, target start date, and site constraints. Talk with the team Nova Trinity Bring GPU capacity online in months, not years. Customer-supplied or Nova-operated deployments, with Nova running site power, cooling, networking, and remote operations. Direct email: adam@novatrinity.xyz Privacy Policy Terms and Conditions
nova-render-20260505-creative-authority-v2-how-sequence-ui175
bottom of page